Client: St William
Architect: JTP
Use: Office, Commercial & Residential
Units: Approx 2,800 new homes, school and commercial units.
Height: 152m

Leven Road Gasworks is an award winning major urban regeneration development which gained planning approval from the London Borough of Tower Hamlets (LBTH) in October 2019.

The hybrid scheme will provide over c.2,800 homes (35% affordable) across the former gasworks site alongside a school and multiple commercial uses.

Throughout the project, a range of bespoke design and assessment techniques were used to optimise the scheme ahead of the planning submission. The client was committed to providing high-quality amenity for both existing and future residents, which required extensive work on the daylight design. The resulting scheme secured planning permission and won Planning Permission of the Year at the Planning Awards.

Barking Riverside

From initial instruction various design stage works were undertaken to highlight the most constrained areas of the scheme and scheme changes were proposed to improve the light levels within the scheme and improve amenity to future residents. These included optimising the massing at master planning stage as well as considering unit layouts, window sizing and balcony arrangement.
Cutbacks were also undertaken to highlight the areas of the massing causing the most significant impacts on the surrounding neighbouring properties. A great deal of consultation with local residents was undertaken, and concerns were taken on board throughout the process to ensure that the scheme delivered what was required, but also met the aspirations of the developer. In fact it was this community consultation alongside the provision of a development with high levels of amenity that led to this scheme winning its award.
When presenting analysis to the Local Authority, ‘Mirror Assessments’ were used to set alternative targets based on schemes in the surrounding context. This BRE recommended method was accepted by the Local Authority, which meant unavoidable deviations from the targets were deemed acceptable and reasonable.

Contact us More case studies